TICAD IV Follow-up Mechanism Annual Progress Report 2009
Annual Progress Report 2008  Annual Progress Report DIGEST 2009
JapaneseFrench

SectorsImplementing PartnersCountriesReporting Years

1-1. Infrastructure   [ Boosting Economic Growth ]

Annual Progress Report 2008(HTML) 2009(PDF) PDF

1-1-0. Overall

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
  GoJ/JICA GoJ (MOFA)/JICA: Grants and technical assistance out of ¥37 billion on infrastructure (*)
GoJ: Provision of loans to projects under this sector (*)

1-1-1. Regional transport infrastructure, including roads and ports

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
[1] Provide financial and technical assistance for the planning, construction and improvement of regional transport corridors and international ports. ● Development/expansion of national and regional transport corridors GoJ/JICA/WBG/AfDB/EC/ICA WBG: Scale up co-financing, estimated financing of $ 600 million
EC: € 5,6 billion in 10th EDF
AfDB: $ 5 billion
GoJ/WBG/AfDB/ICA: Use the Infrastructure Consortium for Africa (ICA) as a platform to promote regional infrastructure development
GoJ(MLIT) Implementation of study and support for development of road infrastructure
[2] Support capacity building for the management and maintenance of regional infrastructure.
[3] Promote facilitation of cross-border procedures such as One Stop Border Post (OSBP).
● Promote facilitation of cross-border procedures GoJ(MOFA)/GoJ(MOF)/GoUK(DFID)/JICA GoJ (MOFA)/JICA: Expansion of the OSBP project to 14 points
GoUK(DFID): Support OSBP in the framework of the Regional Trade Facilitation Programme at a border post in Southern African region
GoJ (MOF): Hold seminars/training and dispatch experts in the field of customs in collaboration with WCO
[4] Support technical cooperation for comprehensive community development along with infrastructure development.

1-1-2. Regional power infrastructure

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
[1] Strengthen cooperation to provide a stable power supply for the whole region, and to build capacity to manage and maintain regional power networks. ● Support development/expansion of power projects and transmission and distribution networks GoJ/WBG/AfDB/Africa-EU Partnership on Energy/ICA/JICA WBG: (i) Double annual lending to $ 2 billion and aim to mobilize another $ 2 billion in co-financing,
(ii) Support to Southern Africa, West Africa, Central Africa and East Africa Power Pools in the order of $ 500 million per year,
(iii) IFC to finance 15 + Public Private Partnership (PPP) in power sector FY 2008-2011, estimated financing of $400-500 million
AfDB: $ 5.5 billion for power generation, transmission and distribution
GoJ/WBG/AfDB/ICA: Use the ICA as a platform to promote regional infrastructure development
EU: ca. € 300 million

1-1-3.Water-related infrastructure

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
[1] Support agricultural water-development initiatives to rapidly expand the share of land under irrigation, and other improved water control and management infrastructure.

1-1-4.Enhanced involvement of regional institutions

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
[1] Support capacity building of Regional Economic Communities (RECs) and regional development banks to better plan, finance and execute infrastructure programs, and provide technical assistance for regional infrastructure investment planning.

1-1-5.Promotion of public-private partnership (PPP) in infrastructure

Yokohama Action Plan Proposed Measures by Japan/Implementing Partners Implementing
Partners
Potential Resources, Possible Contributions (Summary)
[1]Promote, support and strengthen PPP in infrastructure such as ports, railway and electric power plants to increase opportunities for the private sector by utilizing other official flows (OOF).
[2]Others ●Conduct a feasibility study to implement a project of STEP (Special Terms for Economic Partnership), industrial and logistic infrastructure for enhancing trade and investment with Japan, or participation of private enterprises GoJ(METI) GOJ (METI): Project of industrial and logistic infrastructure for global environment adoptation and utilization of Japanese technology

●Concrete projects will be selected through consultations between Japan/Implementing Partners and African countries.
●MDB projects are to be decided.
●$ = US dollars
●Assistance measures written on a yellow ground are those embodied in 2008 (JFY) after TICAD IV.
●Assistance measures written on a pink ground are those embodied in 2009 (JFY) after TICAD IV.