Sector | # | Project Name | Project Description | Executing Agency | Project Cost (million) | Location |
---|---|---|---|---|---|---|
Transportation | 1 | Mahkota II (Mahakam Kota II) Bridge Project | Construction of the bridge. | Ministry of Public Works | US$26.5 | East Kalimantan. |
2 | Semplak By Pass project | Construction of By Pass. | Ministry of Public Works | US$6.00 | West Java. | |
3 | Kediri Bridge Project | Construction of the bridge. | Ministry of Public Works | US$3.87 | East Java. | |
4 | Rantauan Keliling Ilir Bridge Project | Construction of the bridge. | Ministry of Public Works | US$3.33 | South Kalimantan | |
5 | Enggano Flyover Project | Construction of the flyover. | Ministry of Public Works | US$9.5 | Jakarta. | |
6 | Kalibanteng Traffic Improvement Project | Construction of the flyover interchange. | Ministry of Public Works | US$5.00 | East Java. | |
7 | Jakarta Mass Rapid Transit System (1) | Construction of substructure and superstructure for Mass Rapid Transit System. | Directorate General of Land Communications (DGLC), Ministry of Communications and Provincial Gov. of Jakarta | US$658.72 | Jakarta. | |
8 | Railway Double Tracking between Tanah Abang and Serpong on Jakarta-Merak Line (Serpong Line Modernization for Jabotabek R/W Project) | Construction of the second track beside the existing track of Tanah Abang -Serpong Railway Line. | DG of Land Communications, Ministry of Communications | US$115.00 | Jakarta, Banten. | |
9 | Tanjung Priok Access Road Construction Project Phase II | Completion of Tanjung Priok Access Road Construction (12.08 km) . | DG of Highways, Ministry of Public Works | US$257.52 | Jakarta | |
10 | Bridge Replacement for Improvement of National Road Network | Replacement and construction of the bridges with crucial importance and significance in Java, Sumatra, Kalimantan and Sulawesi. | DG of Highways, Ministry of Public Works | US$165.76 | Java, Sumatra, Kalimantan, Sulawesi | |
11 | Construction of Kelok 9 Bridge in West Sumatra | Construction of Bridges alongside of the Kelok-9 of West Sumatra. | DG of Highways, Ministry of Public Works | US$36.2 | West Sumatra | |
12 | Indonesian Coast Guard Patrol Boats Retrofit Project (9 units) | Retrofit of 9 units fast boats for maritime safety law enforcement (class-III), consulting service/supervision and training. | DG of Sea Communication, Ministry of Communications | US$46.8 | Jakarta | |
13 | Two Step Loan Project for Development of Domestic Shipping Industry | Rehabilitation and renewal of existing fleet. | DG of Sea Communication, Ministry of Communications | US$302.00 | Jakarta | |
14 | River Port Development at Muara Sabak on Batanghari River, Jambi Province, Sumatra | Construction of 1 container terminal, 1 general cargo terminal, container berth, container vessels, land facilities including the total terminal area 2.5 ha. | DG of Sea Communication, Ministry of Communications | US$22.5 | Mid-stream to down-stream regional of Batanghari River Basin | |
15 | New Medan Airport Construction Project | Construction of runway, apron, parallel taxiway, exit taxiway; construction of passenger terminal and operational building. | DG of Air Communication, Ministry of Communications | US$225.00 | North Sumatra | |
16 | Recondition and Procurement of Airport Rescue and Fire Fighting Equipment | Procurement of fire fighting vehicles and recondition the old fire fighting vehicles in order to fulfill ICAO operational safety standard for airport under DGAC. | DG of Air Communication, Ministry of Communications | US$19.5 | North Sumatra, Central Java, West Nusa Tenggara, Central Kalimantan, Papua, Maluku, Bengkulu, East Kalimantan, Central Sulawesi, Gorontalo | |
17 | Procurement of Airport Maintenance Equipment | Procurement of airport maintenance equipment. | DG of Air Communication, Ministry of Communications | US$30.54 | 30 Provinces | |
18 | Asset Management for Road and Bridges | To maintain road and bridge condition at a required level of service in a most efficient and effective way through their life time. | DG of Highways, Ministry of Public Works | ¥5,400.00 | Throughout of Indonesia | |
Water Resources | 19 | Integrated Water Resources and Flood Management for Semarang | 1.West Floodway / Garang River improvement, 2. Construction of Jatibarang Multipurpose Dam and Water supply System, 3.Urban Drainage System improvement. | DG of Water Resources (DGWR), Ministry of Public Works | ¥18,450.00 | Central Java. |
20 | Padang Area Flood Control Project (III) | To increase the development potential of flood control of Padang. | DG of Water Resources (DGWR), Ministry of Public Works | ¥11,690.00 | West Sumatra. | |
21 | Project Type Sector Loan, Phase III | To alleviate the poverty in the rural area through increase of agriculture production by the means of rehabilitation of irrigation system infrastructure and improvement of irrigation O&M system. | Ministry of Public Works | ¥36,000.00 | Sumatra, Java and Kalimantan Islands | |
22 | Integrated Reservoir Sedimentation Control and Hydrological Data Network Management Project | Rehabilitate the existing dam reservoirs, and to develop the O&M system and hydrological data network | Ministry of Public Works | ¥40,000.00 | Whole Indonesia | |
Regional Development | 23 | Makassar Water Supply Phase 2 | To maintain the production capacity of the existing Somba Opu water treatment plant at 1,000L/s and to extend the services level from 63% to 83% of population | City Gov. of Makassar | ¥8,000.00 | South Sulawesi. |
24 | Urban Infrastructure Improvement of the City of Makassar | Improvement of living environment through management of waste water. | City Government of Makassar | US$15.00 | South Sulawesi. | |
25 | Rural Urban Linkage Infrastructure Support for Local Economic Development | Improvement of infrastructure to support local economy. | Ministry of Public Works | US$300.00 | Whole provinces | |
26 | Sewerage System Improvement Project in the City of Medan | Improvement of living environment through management of sewerage. | Directorate General of Urban and Rural Development (DGURD), Ministry of Public Works and City Gov. of Medan | US$100.00 | North Sumatra. | |
27 | Umbulan Water Project Supply Project (E/S) | To increase water supply coverage in the city of Surabaya, Malang, Pasuruan. | Ministry of Public Works | US$50.00 | East Java. | |
28 | Upland Integrated Area Development with Specific in Karst Region | To improve environmental capacity, economic growth, quality of life and education. | Directorate General of Regional Development (DGRD), Ministry of Home Affairs | US$6.00 | Java, Sulawesi, Kalimantan. | |
29 | Rural Areas infrastructure Development Project (IV) | To reduce poverty through the basic infrastructure development in rural area. | DG of Regional Development, DG of Community Empowerment, Ministry of Home Affairs and DG of Urban and Rural Infrastructure Development, Ministry of Public Works | US$300.00 | Sumatra, Kalimantan, Sulawesi, West Nusa Tenggara. | |
30 | Upland Plantation and Land Development at Upper Citarum Watershed | To conserve soil and water resources by implementing re-greening program in upland areas; to increase farmers' income through the community development; to strengthen communities to empower environmental management. | DG of Regional Development, Ministry of Home Affairs | US$60.00 | Bandung | |
Information Technology | 31 | National Geo-Spatial Data Infrastructure Development Project | Acquisition of National Geo-Spatial Data, production of National Geo-spatial data and strengthening of the GIS Data Center. | Bakosurtanal | US$100.40 | Jakarta. |
32 | Local Administration Capacity Building and Human Resources Development Using ICT, Pilot Model Development Project in Batam (E-Government in Batam Island) | Scope of work of this project: e-public service and IT training center. | State Ministry for Communication and Information | US$48.61 | Batam, Riau. | |
Energy | 33 | ERP Application to Support Generation Project | To build ERP (Enterprises Resource Planning) application and to achieve effective and efficiently in power plant operation. | PT. PLN (Persero) | US$10.00 | Java-Bali. |
34 | Asahan-3 Hydroelectric Power Plant Project | To be constructed the HEPP with capacity 154 MW, run of river type and the 150kV transmission line in 28 km. | PT. PLN (Persero) | US$354.00 | North Sumatra | |
35 | Biomass Power Plant Project | To developed steam power plant 1 x 30 MW by using empty bunch and coal as fuel. | PT. PLN (Persero) | US$57.00 | East Kalimantan. | |
36 | Lumut Balai Upstream-Downstream Geothermal Project | To construct the geothermal power plant at the capacity of 2 X 55MW to cover the increasing demand in Southern part of Sumatra island load center. | PT. PLN (Persero), PT. Pertamina (Persero) | US$242.00 | South Sumatra | |
37 | Pangalombian Upstream-Downstream Geothermal Project | To construct the geothermal power plant at the capacity of 1 X 20MW (equal to 950 BPOD). | PT. PLN (Persero), PT. Pertamina (Persero) | US$39.00 | North Sulawesi | |
38 | Kamojang Upstream-Downstream Geothermal Project | To construct the geothermal power plant at the capacity of 60MW to promote more utilization of renewable energy. | PT. PLN (Persero), PT. Pertamina (Persero) | US$121.5 | West Java | |
39 | Peusangan 1&2 Hydroelectric Power Plant Project | To be constructed the HEPP with capacity 86.4 MW and its 150 kV T/L, run of river type. | PT PLN (Persero) | US$120.00 | Aceh (NAD) | |
40 | Rehabilitation and Upgrading of Suralaya Coal Fired Power Plant Project | Rehabilitation and upgrading of boiler, turbine, generator and control instruments. | PT. PLN (Persero) | US$72.00 | West Java. | |
41 | Tanjung Perak Power Station Repowering Project | To build complete Combined Cycle Gas Thermal Power plant having capacity of 332,4 MW. | PT. PLN (Persero) | US$186.00 | East Java | |
42 | Java-Bali Overhead Transmission Line Project | To build OHL (Overhead Transmission Line) between Java and Bali (the first stage) and 500 kV upgrading from Paiton to Kapal Sub Station (second stage). | PT. PLN (Persero) | US$319.87 | East Java, Bali. | |
Stage 1 (Inter connector) | US$55.97 | |||||
Stage 2 (in land 500 kV OHL) | US$222.3 | |||||
Contingency | US$41.6 | |||||
43 | North and West Sumatra Interconnector (Payakumbuh-Padang Sidempuan) | To create Sumatra interconnected system; to ensure reliability of supply for Bali system. | PT. PLN (Persero) | US$50.00 | West Sumatra | |
44 | Kusan Hydroelectric Power Plant | To be constructed the HEPP with capacity 130 MW, dam type, the 150 kV transmission line and substation. | PT. PLN (Persero) | US$200.00 | East Kalimantan | |
45 | Asam-asam Steam Power Plant Construction Project | To be constructed the steam coal power plant with capacity 130 MW (65 MW*2 units) . | PT. PLN (Persero) | US$130.00 | South Kalimantan | |
46 | Malea Hydroelectric Power Plant Project | To be constructed the HEPP with capacity 184 MW, run of river type. | PT. PLN (Persero) | US$220.00 | South Sulawesi | |
47 | Bonto-Batu hydroelectric Power Plant Development Project | To be constructed the HEPP with capacity 100 MW, run of river type and the 150 kV transmission line in 11 km . | PT. PLN (Persero) | US$120.00 | South Sulawesi | |
48 | Rural Electrification for Sustainable Development Project | To establish the "Village Electrification Fund (VEF)," "Village Electrification Promotion Center (VEPC), database of villages submitted Expression of Interest (EoI) and "Village Electrification Cooperative (VEC)" in order to expedite Rural Electrification. | PT. PLN (Persero) | US$25.00 | Whole country | |
Education and Human Resource Development | 49 | Professional Human Resource Development | The program would be beneficial for human resources quality improvement in the Ministry of Finance, BAPPENAS, and other central and regional government by having doctor, master and non-degree programs. | BAPPENAS and Ministry of Finance | US$70.5 | Jakarta |
50 | The Development of the Engineering Faculty, Hasanuddin University, Makassar | To develop university as a center of excellence in sense of developing quality of human resources in eastern Indonesia. | Ministry of National Education | US$47.8 | South Sulawesi | |
51 | Project for Educational Quality Enhancement Through IT Utilization in Yogyakarta Province | To improve the quality of education at elementary and junior secondary levels in Yogyakarta Province as a model province for Indonesia by effectively utilizing IT in education sector, thereby contributing to human resource development of Indonesia. | Provincial Government of Yogyakarta | US$50.72 | Yogyakarta | |
52 | The Development of World Class University of Indonesia | Construction of teaching hospital, various faculties, university library, art and sport center. | Ministry of National Education | US$200.00 | Jakarta | |
Human Settlement | 53 | Neighborhood Infrastructure Development to Support One Million Housing Program | The Project will help the Government to build equitable systems of housing and neighborhood infrastructure through (1) strengthening the capacity of local governance to make a planning process for KASIBA/LISIBA plan and (ii) providing the development of neighborhood infrastructure in KASIBA/LISIBA and self-help community housing areas. | DG Housing Settlement, Ministry of Settlement and Regional Infrastructure | US$100.00 | Whole country |
Trade, National Enterprises Development, Finance, and Cooperatives | 54 | Development of Testing and Calibration Laboratory in the Central and Regional | Improving role and ability of testing laboratory, laboratory calibrate and certification body in central and regional. | DG of Foreign Trade, Ministry of Trade | US$35.00 | 25 Provinces |
55 | Development of Legal Metrology in Indonesia | To modernized the institutional arrangements for metrology, measurement, and the verification service facilities. | DG of Domestic Trade, Ministry of Trade | US$58.42 | Directorate of Metrology, Metrology Training Centre and Seven Key Offices |
- The projects mentioned in this list are possible candidates for ODA loans. The Government of Japan does not endorse the provision of ODA loans by any means.
- The information mentioned in this list is provisional as of 1 December, 2005 and subject to change.
- Project costs mentioned in this list are based on the estimation by the Government of Indonesia and subject to change.
Back to Index